Briefing 12 // SUBSYSTEM: Audit & Governance // 36 PAGES A4 PDF ● DIRECT DOWNLOAD (ZERO EMAIL GATE)

The Annual ISO 22301 Live Black-Start Audit & Tabletop Exercise Pack

A structured 12-point physical readiness inspection and 90-minute crisis simulation for UK leadership teams.

Mandatory Plant-Room Commissioning Checklist

  1. Perform a live 30-minute mains-off transfer test on comms racks, EPOS, and emergency lighting
  2. Test out-of-band radio and 868MHz mesh check-ins across all floor wardens and remote sites
  3. Sample and test standby generator fuel (or transition from FAME diesel to 10-year shelf-life HVO)
  4. Sign off the annual ISO 22301 Management Review log for insurers and enterprise clients

Full Standard Operating Procedure (SOP) Protocol

# RESILIENCE LAB TECHNICAL SOP 12 ## The Annual ISO 22301 Live Black-Start Audit & Tabletop Exercise Pack