ISBN-13: 978-1849195201 // EDITION: 2018 // Tier 2: Hands-On Bench Manual ● HARDCOPY REFERENCE MANUAL (COMING SOON — REGISTER INTEREST)

Standby and Emergency Power Systems: Design, Commissioning & Diesel ATS Engineering

Author / Issuing Authority: IET / CIBSE Commissioning Reference • Category: Home Systems, Solar & Water Engineering

Practical UK facilities manual on standby diesel generator sizing, step-loading, wet-stacking prevention, HVO fuel storage & ATS wiring.

Why This Manual Matters in a Grid-Down Outage

Standby diesel generators that are only tested on no-load for 10 minutes a month suffer cylinder glazing ("wet stacking") and fuel bug contamination—failing within 20 minutes when a real blackout hits.

Plant-Room & Field Operational Takeaway

Provides load-bank testing schedules, EN 590 fatty-acid methyl ester (FAME) vs. EN 15940 HVO synthetic diesel transition checklists, acoustic flue rules, and ATS changeover timing.

Maintaining a physical dead-tree edition of Standby and Emergency Power Systems: Design, Commissioning & Diesel ATS Engineering (ISBN-13: 978-1849195201) in your plant room, comms rack, or site incident grab-bag ensures engineers and duty wardens have immediate access to statutory tables, pinouts, and safety protocols when cloud documentation portals and corporate intranets are unreachable.